Plainwork

Plainwork / Incident Letter / IT incident report template (one page, with example)

IT incident report template: one page, copy and fill in

An IT incident report is the record you keep after something broke: a server down, a mailbox migration gone wrong, a laptop fleet locked out. It is read later by your manager, an auditor, a client, or you six months on when the same thing happens. This page gives you a one-page template with a short note under each field saying what belongs there, and a filled-in example. The incident in the example is invented.

Who this is for

IT managers, sysadmins and managed-service shops that need a plain record of an incident, not a full engineering postmortem. If the reader is a customer who was affected, use the customer incident report guide, which puts impact and apology-free facts first. If the reader is your own team, a blameless review is the better fit; this record is the factual page that review starts from.

The template

INCIDENT REPORT: [short title, e.g. "File server unavailable"]
Reference: [ticket or incident number]      Severity: [your scale, with one-line meaning]
Reported by: [role]   Incident lead: [role]   Report date: [date]

1. SUMMARY (2 sentences)
What stopped working, for whom, from when to when.

2. IMPACT
Systems and services affected:
Users or sites affected (count, or "unknown"):
Business effect (work stopped, data at risk, deadlines missed):
Data lost or exposed? [yes / no / not yet known] + how you know.

3. TIMELINE (one zone, stated; use 24-hour times)
[time]  first sign (alert, user report, monitoring)
[time]  incident declared / ticket opened
[time]  actions taken, one line each
[time]  service restored
[time]  confirmed stable

4. CAUSE
Confirmed cause:
Contributing factors:
Not yet known:

5. FIX AND WORKAROUNDS
What restored service. Anything still temporary.

6. FOLLOW-UP ACTIONS
Action | Owner (role) | Due date | Done?

7. SIGN-OFF
Reviewed by:   Date:

What belongs in each field

FieldPut inLeave out
SeverityThe level from your own scale and what it means in a phrase ("S2: one site down, workaround exists").A level without a scale. "High" means different things to different people.
SummaryWhat, who, when. A reader who stops here still has the facts.The cause, unless confirmed. Keep it for section 4.
ImpactA count or "unknown". State separately whether data was lost or exposed, and how you know."Minimal" or "some users" with no number and no basis.
TimelineTimes from logs or tickets, in one zone. Mark an estimate with "about".Times from memory presented as exact. Mixed zones.
CauseOnly what you confirmed. Put guesses under "not yet known" or as "suspected".A name. Write the role or the process gap.
Follow-upOne owner and one date each, so someone can ask "is it done?"."Review procedures". Say which, and by when.

Filled-in example (invented)

INCIDENT REPORT: File server unavailable at the Leeds office
Reference: INC-0412      Severity: S2 (one site down, workaround exists)
Reported by: Service desk   Incident lead: IT manager   Report date: 2026-03-12

1. SUMMARY
The shared file server at the Leeds office was unavailable from 08:41 to 11:20 UTC on 2026-03-11. Staff there could not open shared files; the other two sites were not affected.

2. IMPACT
Systems: file server LDS-FS1 and the mapped drives that use it.
Users: about 35 at Leeds (count from the AD group; not all were in that day).
Business effect: payroll preparation moved to the afternoon; no deadline missed.
Data lost or exposed: no. The last backup at 02:00 was intact and the disk volume was not modified.

3. TIMELINE (UTC)
08:41  Service desk receives first call: drives not connecting.
08:50  Ticket INC-0412 opened; server found powered on but unreachable on the network.
09:15  Switch port for LDS-FS1 found in error state after an overnight firmware update.
10:05  Port reset; no change. Decision to move the server to a spare port.
11:20  Server reachable; drives reconnect.
11:45  Users confirm access; incident closed as stable.

4. CAUSE
Confirmed: the switch port went into an error state after the firmware update.
Contributing: the update was run on the switch overnight with no check of the server's link afterwards.
Not yet known: why the port did not recover on its own; the vendor has been asked.

5. FIX AND WORKAROUNDS
Server moved to a spare port. Still temporary: the original port is disabled until the vendor replies.

6. FOLLOW-UP ACTIONS
Add a post-update link check to the switch change checklist | IT manager | 2026-03-20 | open
Chase vendor on the port error | Network engineer | 2026-03-18 | open
Test a restore from the 02:00 backup | Sysadmin | 2026-03-31 | open

7. SIGN-OFF
Reviewed by: Operations director   Date: 2026-03-13

Before you file it

  • Every time has a zone and they all match.
  • The impact section says whether data was lost, and how you know.
  • Each cause is either confirmed or labelled suspected.
  • Every follow-up has one owner and one date.
  • No personal names, passwords or customer data. Use roles.

Working out durations and checking a customer version

Paste the timeline into the free timeline calculator and report checker to get time to detect, time to fix and total duration, and to see which parts of a customer-facing version are missing. It runs in your browser and uploads nothing. See also the annotated post-incident review example and the status page update templates.

If the reader is a client and you would like a first draft of the report, a status page post and a cover email made from your own notes, with every time or cause you did not give left as a marked blank, see the $9 draft service (AI-written by Claude, not legal advice).

More from the catalogue

Other small tools

See everything →